New construction of county industrial park, construction of pre-embedded line in CPVC power pipe supporting factory area

2026-06-17

New construction of county industrial park, construction of pre-embedded line in CPVC power pipe supporting factory areathe1page

During the construction of the county industrial park, the construction of the pre-embedded line of the power system is the core link to ensure the subsequent production and operation of the park. CPVC power pipe has become an ideal choice for supporting construction due to its excellent insulation, corrosion resistance and mechanical strength.

In the early stage of construction, it is necessary to complete the on-site survey, clarify the route direction, burial depth requirements and the spacing with other pipelines in the park, and determine the specifications and laying quantity of CPVC power pipes in combination with the power consumption planning of the factory area. Then carry out the trench excavation operation, strictly according to the design depth and width of the construction, to avoid destroying the original underground facilities. After excavation, clean up the sundries at the bottom of the trench in time and lay them flat.

In the pipe laying stage, first connect the CPVC power pipe section by section, and use a special adhesive to ensure that the interface is firmly sealed to avoid leakage or loosening. Keep the pipe straight when laying, and set a fixed bracket every certain distance to prevent the pipe from shifting. For sections with large turns or slopes, special bends need to be processed in advance to ensure smooth lines.

After the pipeline is laid, backfill operation is carried out. First use fine soil to cover the top 30 cm of the pipeline, and then backfill and tamper in layers to avoid the use of stones and other sharp objects to damage the pipe. After backfill, quality inspection is required. Check whether the inside of the pipeline is smooth through the ball test, and check the insulation performance to ensure that it meets the electric power construction specifications.

During the construction process, attention should be paid to the protection of trench drainage during the rainy season to prevent water from soaking the pipeline; during the winter construction, attention should be paid to the use temperature of the adhesive to avoid affecting the bonding effect of the interface due to low temperature. Only by strictly following the construction standards throughout the process can we build a stable and safe power pre-embedded line system for the county industrial park and provide a reliable guarantee for the long-term development of the park enterprises.